WELCOME TO SHIPSPOTTING.COM
Description:
Passing Paull outward 11/07/21 to the Hornsea 2 Offshore wind farm with a full load of 4 turbines to install. The blades are much longer, giving her a beam when loaded of 85m.
This ship exists in the following categories:
Construction Maintenance Vessels - 33 photos
2 photos
1 photos
2 photos
3 photos
1 photos
1 photos
3 photos
2 photos
1 photos
1 photos
5 photos
1 photos
2 photos
2 photos
2 photos
1 photos
1 photos
2 photos
COMMENT THIS PHOTO(1)
Edit
comment